support 24/7
Subscribe!
Home » life » network search engine optimization at

Network search engine optimization at

Job

My position and work duties in organization

The main element responsibilities of my personal job by Bathinda receive below: –

  • Cell Style Data planning for the whole group for new roll out sites with the aid of MCOM. CDD (Cell design data) contain includes BCCH, BSIC, HSN, MAIO, Neighbour and other radio parameters.
  • Accountable for the complete RF optimization of 2G network of Bathinda cluster.
  • Discuss the KPI report to get top10 neighborhoods falling within my cluster which might be Bathinda and Barnala and 7 additional Rest of Network(RON) towns with proper reasons for cells that have been not meeting KPI’s continuously for over 3 days.
  • Update the physical data of every site in my cluster in central Portal to get the record of sites. Physical info contains latitude/longitude, tower type, tower height, azimuth, lean, antenna level, antenna version number.
  • Stringent adherence to compliance with government guidelines(TRAI drive evaluation report submitting and International border network optimization)
  • Weekly Ending up in Reliance Sales team to identify the problematic areas for network. List down the minutes of meeting (MOM) to fix responsibility where option is possible and proper reason for open up issues by cluster level.
  • Weekly meeting call involvement headed by simply optimization lead and fortnightly conference contact headed simply by Performance Lead and Group Network Mind. To set schedule of work being done and discuss the open problems of MOM of previous con- calls.
  • Optimization statement submission of each and every new site and the alterations done about nearby sites.
  • Quarterly Benchmarking drive evaluation of all the organized towns and highways in cluster and post travel analysis record and troubleshooting plan survey submission.
  • Identify the poor network area and give the inputs to the organizing team intended for the protection, capacity or infill sites or sector.
  • Carrier (TRX) addition/deletion and Half Rate changes based upon traffic reports.
  • Drive evaluation of BSC’s migration sites
  • Daily analysis of Network Performance reports (QOS Reports) generally known as RAN 5A and HAPPENED TO RUN B reviews in Huawei BSC(M2000 Server), statistics information to identify the defaulter cells.
  • Perform drive test inside the problematic location and assess the log files and reports of TEMS 7. 0 drive test out kit to check on the insurance coverage (Rx Level), speech quality (Rx Quality), Interference and many others and ensure the compliance as per plan.
  • Data drive test out to check the throughput of GPRS/EDGE to ensure better providers.
  • Study the subscriber complaints reports and provide resolution simply by root cause examination.
  • CE3. 4: -Project: Network Marketing at International Border to compliance with Government suggestions

    CE3. 4. 1 . History of this Project: –

    In the end of year 2010 the Office of Telecommunication (DOT) and Telecom Regulating Authority of India (TRAI) the governmental entities responsible to control the functioning of private mobile providers according to rules arranged by authorities, issued fresh guidelines pertaining to the phone system operators for the network at worldwide border shared with Pakistan. According to new suggestions coverage must restrict in least 500meter before the fencing done at international border in Of india side.

    Reasons behind it were: –

    Improper use of mobile network by illegal elements especially smugglers and burglars (terrorists) to regulate the medication and against the law weapon smuggling to India which originates from Afghanistan and Pakistan.

    Stops the alerts of military services to decode the messages directed cross line by illegal elements.

    Very high penalties were declared by APPEAR IN for the defaulters.

    CE3. 5. 2 . My own Role in this Project: –

    My key obligations in this job were: –

    • a) Recognize the Locations of content of Edge Security Force to approximate the intercontinental border secure fencing.
    • b) Pre drive test along the border with best possible paths.
    • c) Analyze the drive evaluation reports to check on the present status of network.
    • d) Plan physical and parametric changes to get the job done.
    • e) Post activity drive evaluation to check the achievement of work done.
    • f) Analyze the targeted traffic trend of targeted sites.
    • g) Meetings with sales team to get the customer complaints due to restricted coverage.
    • h) Try to provide the greatest solution to buyer complaints to reduce churning of existing members.

    CE3. four. 3 PERSONAL ENGINEERING ACTIVITY

    CE3. four. 3. you Chalk out your plan

    Worldwide border in Bathinda cluster was more the a hundred and fifty K. Meters in length coming from Husainiwala inside the north and Hindumalkot in the south. There were major problem to identify the fencing at near the boundary of two countries as whole border is in zigzag way and also not defined for many locations as lake Satluj is flowing along the fence. After every Monsoon time of year, fencing was being damaged as a result of heavy rains and drinking water logging in nearby areas.

    CE3. four. 3. 2: -ENGINEERING ACTIVITY

    My spouse and i identified web sites which can expand up to the border. in initial phase I had taken the site which were within 12 K. M distance in the border. I analyses the traffic craze of these cells specially portion towards line. I see the TA information in detail to correlate the traffic of cell in accordance the distance from your site. In that case to start the field activity I started to collect the physical data of these sites. The data accumulated for this particular project comes with: –

  • Latitude/Longitude
  • Azimuth
  • Tilt
  • Height of GSM antenna
  • I prepared to take support from Border Security Power to visit the posts that are situated incredibly near to border. But they rejected giving authorization for therapy equipment TEMS investigation application and Gps System. My spouse and i informed my reporting supervisor about the situation and my ring office set up the duplicate of rounded received contact form DOT from Reliance Interaction and provided for the higher authorities of BSF. Then they consented to give pass to roam near to edge and a BSF rep allotted to us to visit the areas you want to check the network and have inputs.

    I collected the data coming from various places of a particular target region through the drive test with the help of TEMS. The information collected in the various items at boundary were: –

  • Latitude/Longitude
  • Providing Cell
  • RX Level (Signal Strength) of offering cell in idle mode
  • RX Level (Signal Strength) of serving cellular in committed mode
  • Timing Progress (TA) of serving cell
  • Skin cells in neighbors list of offering cell
  • RX Level (Signal Strength) of neighbors cells
  • Timing Progress (TA) of neighbor cells(blocking to particular BCCH, 1 by one)
  • Analysis of Drive test and Physical Data Collection: -In analysis it was found some of the locations already had not the coverage of Reliance network but many were the strong devices of organization in terms of customer density because of presence great signal quality.

    ¢ The cellular material facing towards border acquired very strong transmission strength. Because the edge is angle few sites were set up very all around border in those neighborhoods which had high human population.

    • Handful of cells were serving at distances (TA more than 12, 1TA …550m) where these people were planned to get served.
    • A few cells had been serving in Rx Level -100dbm.
    • Several cells had been serving in their back lobe

    Activities Organized

    • Azimuth Change(Away coming from international edge wherever possible )
    • KONSTRUERA restriction for those serving cellular material.
    • Output power of TRX decreased to 37W (43dbm=20W) via 40W (46dbm).
    • Height Decrease of GSM antennas facing towards foreign border.
    • Lean increased of GSM antennas facing to international line.
    • Height and tilt lowering of GSM antennas that have been serving within their back lobe.

    After detailed analysis of Drive test out outputs and traffic reports with the help of Mapinfo and MCOM, TA constraints done so that no call can be matured before 500m from international border. Test request to OMCR to make changes in TAG is given beneath: –

    Physical Improvements: As most of serving sites at international border were Ground based towers (GBT) with 60 meter tower height and GSM antenna height by 40meter height and tilt changed to new reduced principles so that RF can be easily controlled to match the guidance given the federal government authorities.

    • Length from International Border GSM Antenna Elevation GSM Antenna TILT
    • Border¤3KM 20-22 m 2 to 4
    • Border>3KM¤5KM 28-32meter 2 to 4
    • Border>5KM¤10KM No change 2 to 4

    Content Drive Test out: when we finish all the prepared activities throughout the border by more than 75 sites we followed the same procedure to obtain the observations for various locations. With the help of TEMS investigation device and Garmin Global positioning program (GPS) we all measured the signal durability very close to the border while the places where we all visited during pre drive test. Each of the testing carried out with two diverse mobiles, one out of idle function and other was at dedicated mode with brief call efforts. Observations from the post activity drive ensure that you other QUALITY OF SERVICE reports were: –

    • Zero coverage at most of the worldwide border
    • Few locations had protection but phone success rate can be zero as a result of TCH give failure as TA limit applicable about serving cell.
    • Comprehensive reduction in coverage over the border as a result of physical changes(reduced height and increased point )
    • KPI drop in cells due to parametric changes like Handover effectiveness, TCH give fail, drop rate etc .
    • Few locations still having coverage (Rx Level-100dbm) through the sites having TA ¥30. Sites discovered and activities planned pertaining to secondary stage of the project.
    • Sharp drop in traffic results low utilization of TRX occupancy.
    • Embrace existing client complaints and the new service falls to 1/4th after the activity.

    CE3. 4. 3. three or more Problems and solutions: –

    The greatest problem is the terrain close to international boundary due to riv Satluj and lot of accord from numerous authorities to have the access near to BSF blogposts due the restricted location At a large number of locations attaining near to the border was not conceivable by automobile due to damaged or no tracks connecting the BSF posts the gravel roads. We all reached there by foot or perhaps on the army trucks together with the testing equipment. At two posts we all reached by a boat because at some spots Indian inhabitants as dwelling on the other side from the River Satluj and motorboats were the sole mode of transport to succeed in these towns at that time. To get access the BSF representative assigned to us was in constant touch to have the permissions before hand.

    The other major problem was as per our expectations was the customer complaints coming from the areas where influence of activities was maximum due to parametric and physical changes. There were huge pressure from sales force to rectify the network issues which has been addressed 1 by 1 and way to few had been provided by changing the azimuth and decrease in tilt. Fresh Micro sites were planned on priority with TA=4 with 20meter GSM height pertaining to villages and signal booster devices were set up at BSF posts that have been at the range from boundary.

    As per below provided diagram for the research: -Before activity all the populations1, 2, a few were protected as TA was at default value 63 but following your TA restrictions Cell A and Cell B that were serving in international border at a distance of 2. 5Km(TA =5) changed to TA=4 so that it sops taking phone calls 500meter ahead of border nevertheless the population two and inhabitants 3 that have been at the range higher distance from the internet site than the foreign border turn into uncovered following TA execution.

    Tiny sites organized for populace 2 and population several.

    CE3. 5: -SUMMARY

    This is the 1st project wherever I was consistently coordinating with government authorities and officers of Border Secureness Force, hence this project helps me personally to boost myself confidence by further level that I are designed for such assignments with responsibility in full grown manner. Just about every communication is usually documented through this project in accordance with the guidelines issued by Section of telecommunication and Mobile phone authority of India thus i learnt how a works at government level was being done. It brought my self-confidence at another level and I became ended up being employee of top administration for the federal government related tasks in future. Technically my skill set bags one more concepts of Timing Advance(TA) and BTS power managing and preparing of new sites respective for the clutter need in more depth. Observations of step by step physical changes enhanced my ability to plan and predict leads to my furth.

    < Prev post Next post >

    Find Another Essay On Exploiting My Strengths and Strengthening My Weaknesses

    Cultural dissension in the usa after ww my spouse

    Nostalgia Following World Warfare I, lots of men who had visited fight inside the war had been returning and desired to take their jobs back through the women and Photography ...

    Boy scoutsas a worthy organization for young men

    Boy Scouts The Boy Scouts of America have had a profound effect on American history. They will as a group have done community support beyond any other group, and best ...

    The surroundings of the dark land in the

    Persistence, Rescatador Dali In Salvador Dalí’s The Determination of Memory, I see the landscape of any dark piece of land. As the dark terrain continues to be able to the ...

    11 approaches to describe yourself for your next

    Interview, Meeting You will be in the reception of your desire company for a job interview, dressed in the best formal you had with good frizzy hair and refined shoes, ...

    81528975

    Life, Popularity Life of Fame Marilyn Monroe when said, “Hollywood is a place where might pay you 1000 dollars for any kiss and fifty cents for your soul” (“Marilyn Monroe”). ...

    Love horoscope and suitable zodiac presents

    Courtly Love, Valentine Day With this Valentines Day time, get to know about your love life this year. Aries Aries are brave, enthusiastic and determined and are natural market leaders. ...

    Cognitive method and international policy making

    Decision, International Policy, Plan Michael J. Shapiro is usually an American nationalist and a Professor of the Political Savoir at the College or university of Hawaii islands. He is most ...

    The motivation letter for you personally

    Inspiration Have you ever dropped your determination? Or felt that your life is without purpose to it? I am not referring to …., nevertheless the times when you would look ...

    Biography of onscreen siren mandy day job

    Biography, Pornography Mandy Muse is a stunning pornographic actress who was given birth to in San Diego otherwise in October 18, 1994. Mandy was raised in Lake Forest Orange County ...

    Product description spa

    Beauty, Safe place The new hot tub is going to be comparatively small and the style will be Western and Thailänder, which is short for simplicity and comfort. It will ...
    Category: Life,
    Words: 2275

    Published: 03.02.20

    Views: 539

    A+ Writing Tools
    Get feedback on structure, grammar and clarity for any essay or paper
    Payment discover visa paypalamerican-express How do we help? We have compiled for you lists of the best essay topics, as well as examples of written papers. Our service helps students of High School, University, College